Intake Manifold: Ambitious Transport Project
The order: to transport an intake manifold for a full-service supplier of small hydroelectric power plants from Prjedor (Bosnia) to St Pölten (Lower…
Transport of a Bridge
In the course of renovation work in the area of the Oslo Opera House and the adjacent Munch Museum, a new pedestrian bridge was installed. a new pedestrian bridge was also…
Break Bulk shipment
Break bulk is the term used to describe goods that, due to their special nature (size, weight) place special requirements on the planning, organization and execution of the…
Artificial Tween Deck
For the break bulk transport of a 60 tons heavy crate measuring 8 x 3 x 3.5 metres, a so called artificial tween deck, a steel platform with hardwood flooring to secure the…
RoRo (Roll on/ Roll off) Shipments
RoRo shipments are part of our Projects & Break Bulk service portfolio: via ramps different kinds of loads are driven on and off the ship safely. Some…
Out of Gauge Container
Our employees have long and proven experience in the area of out of gauge containers - the transport of oversized cargo such as generators, machine parts or bulky…
Oversized Road Transports
Gebrüder Weiss owns the necessary expertise and the appropriate network of specialized partners to perform various kinds of special transports on the road throughout Europe…
Anchor Chains and mooring Pile for a floating Offshore Oil Rig
1250 meters of anchor chains as well as a 33 m long and 81 tons heavy mooring pile – equipment for a floating offshore oil rig – had…
Africa: Extraordinary Challenge
Five complete cement grinding plants – dismantled into their constituent parts – from Europe to West Africa. Our team mastered this extraordinary challenge for a…
Destination Ghana: Grinding Cylinder Weighing 156 Tons
The follow-up order from one of the leading manufacturers of machines for the mining and cement industry turned out to be a real mammoth task –…